Projects of the Energy and Environment Studies Unit


1 "Improving the Performance Of Bagasse Fuel Boilers, for The Sugar And Integrated Industries Company", 1986 – 1997.
2 Methanol Project, for Egytalc Project, for Egyptian Italian Company for Engineering and Construction, 1991-1992.
3 "Supervising The Complete Rehabilitation Process Of Water Tube Boilers In Torah And Mustrod Sites", for Egyptian Starch And Glucose Company, 1991 – 1998.
4 "Establishing Database On Energy Related Studies, Technical Reports And Research Works", For The Organization Of Energy Efficiency And Planning, 1993 – 1994.
5 "Reducing Thermal Losses in Different Components Of The Egyptian Thermal Power Plants", for The Ministry Of Electricity And Energy, 1993 – 1994.
6 "Submitting The Design And Supervising The Implementation Of Ash Catchers, Throughout The Different Sites, Attached To DIA Bagasse Boilers", For The Sugar And Integrated Industries Company, 1993 – 1997.
7 "Design And Supervising The Manufacturing Of A Large-Scale Bagasse Dryer", For The Sugar And Integrated Industries Company, 1995 – 1997.
8 "The Energy and Environment Studies Unit Introduced A Pioneer Design For Balady Bread Baking Oven", For The Greater Cairo Company for Bakeries, 1995-1998.
9 "Ongoing Consultation Activities Covering Steam Boilers, Steam and Condensate Networks, Compressed Air Systems, Pressure Vessels, And Other Mechanical Equipment" For The Eastern Company, 1996 – Present.
10 "Specialized Technical Consultations For Eastern Company, 1997-1998.
11 "Selection And Supervision Of The Erection Of The Industrial Wastewater Biological Plants In The Abovementioned Sites", For Egyptian Starch And Glucose Company, 1997 – 2001
12 "Upgrading The Fuel And Combustion Systems In Clay And Thermal Brick Factories", A Study Financed By The Egyptian Environmental Affairs Agency EEAA, Industrial Compliance Unit, 1998- 2006.
13 "The Modification Of The Article 42 (C), Of The Executive Statutes (338/1995) Of The Egyptian Law On Environment (Law 4/1994), Regarding The Emissions From Boilers, Clay Brick Kilns, And Thermal Brick Kilns", For The Egyptian Environmental Affairs Agency EEAA, 1999-2000.
14 "Techno-Economical Feasibility Study On The Investigation To The Different Alternatives For Exporting Egyptian Natural Gas" For The Organization Of Energy Efficiency And Planning, 2001 – 2002.
15 "Upgrading The Charcoal Kilns To Be Able To Comply With The Environmental Emission Levels. A Demonstration Project In El-Gharbeyia Governorate Was Implemented" For The Egyptian Environmental Affairs Agency EEAA, 2001 – 2002.
16 "A Number Of Projects Of HVAC Systems In Different Company Sites, Including The Use Of The Absorption Refrigeration Technology" For The Eastern Company, 2001 – Present.
17 "Design of an Automatic Up-To-Date Liquid-Fuel Combustion System For The Molasses Facilities Replacing The Primitive Solid-Fuel One", For The Egyptian Environmental Affairs Agency EEAA, 2002 – 2003.
18 "Upgrading The Combustion System Of Hand-Made Pottery Kilns", For The Egyptian Environmental Affairs Agency EEAA, 2003 – 2004
19 "Updating Data And Measurement For Environmental Registers In Eastern Company Factories", 2004-On Going.
20 "Environmental Measurements for different industrial facilities to examine their environmental compliance with the Law 4/1994", 2007 – Now.
21 Updating of the date of environmental analysis in factories of Eastern Company, 2008-Now.
22 Testing and examination of safety valves in Aigesna Engineering, 2008-Now.
23 Measurments and environmental analysis in Nag'a-Hammadi for fiber-Dishna , Quena Governorate . 2008-Now.
24 Two boiler examination in P&J- Sadat Industrial City, 2008-Now.
25 Calibration of Safety valves and pressure gauss in seven stations – NatGas Co. 2008-Now.
26 Environmental Register and Occupational health measurements in Eroglu Egypt Co., 2008-Now.
27 Environmental Measurements at Vertical Jeans Co.
28 Environmental Measurements at TCI Sanmar Chemicals.
29 Environmental Measurements at Tamo Press Company.
30 Environmental Measurements at Befey Company.
31 Inspection and Evaluation of two boilers (gas and Mazott), Concentrates and Juice Company, Sadat City, 2008.
32 Preparation of Technical specifications and tender document of boilers and feed water treatment plant – Eastern Company, Six of October factory, 2008.
33 Environmental measurements of Bristol Mayer Squib Egypt Company, 2008.
34 Testing of Safety Valves, Arigsa Engineering Company, 2008.
35 Environment Condition Record and Environmental Testing for Occupational Health, Analysis of Waste and Impact Assessment, Arowalgo Egypt Company, 2008.
36 Environmental measurements of International 'Sabaa' Company for Textiles, 2008.
37 Environmental measurements of El-Nahr El-Khaled Company, 2008.
38 Testing of Pipes and Check of Safety Valves, Abu Keer Company, Alexandria, 2008.
39 Environmental measurements of Suez Canal Factory, 2008.
40 Environmental measurements of Lotus for Garments Company, 2008.
41 Environmental measurements of Lotus High Tec Company, 2008.
42 Environmental measurements of Completing Egypt Company, 2008.
43 Environmental measurements of Makkawi for Wheat Grinding Company, 2008.
44 Technical and Economical Study for the Rehabilitation of Three (3) Steam Boilers in the Main Branch of the Easter Company and Move them to the New Industrial Complex in the Six of October City, Easter Company, 2008.
45 Test of Safety Valves in Master Gas Co., Master Gas Company, 2008.
46 Technical Study for reducing pressure stations of natural gas, House Gas Company, 2009-Now.
47 Updating of the data of environmental analysis in El Mohandes National Co." Befey Factory", 2009-Now.
48 Updating of the data of environmental analysis in Tamo Press Company, 2009-Now.
49 Environmental measurements of Redembix Press Company " Suez Pack", 2009-Now.
50 Smoke Pollution Measurments from Buses, Trucks and Cranes for Halem Co-operation, Halem Co-operation, 2009- Now
51 The Preparation of Tender Document, Technical Specifications, and Schematic Drawing, and the Supervision of the HVAC System of PM Factory in the Industrial Complex of Eastern Company, Six of October, 2009-Now.
52 The Preparation of Tender Document, Technical Specifications, and Schematic Drawing, and the Supervision of the Executing Co. - Industrial Complex of Eastern Company, Six of October, 2009-Now.
53 Updating the Data and the Measurements of the Environmental Register, the Sixth Stage, for the Main Branch and the Other Branches - Eastern Company, 2009-Now.
54 Bread Production Line,Egyptian for Distribution and Services, January 2010.
55 Emission from Water - Tube Boiler in Egyptian Sugar and Integrated Industries Company, Egyptian Sugar and Integrated Industries Company, March 2010.
56 Environmental Impact Assessment Study (EIA), ElMarakby for Metalic Industries, 4 April 2011.
57 Air Conditioning of Factories (3) , (4), Eastern Company, 17 December 2011.
58 Air Conditioning of Factory (1) , (2), Eastern Company, 18 February 2012.
 59 Air Conditioning of Factory (7) , (8), Eastern Company, 28 April 2012.
60 E/A Sulphonation Plant, Henkel, Environics, 7 July 2012.
61 Enviromental Measurements, Cairo Oils and Soap Company, 15 April 2013.